Choose what you are buying and how you intend to hold it. The list below narrows to the documents that apply, what each one proves, and who issues it.
Checked 31 August 2026. Claims re-checked and corrected on 15 November 2026. A note on building before the permit was added on 27 November 2026. Sources are listed at the end. Jump to them.
Most overseas purchases that go wrong in Indonesia go wrong at the same moment: money moved before an independent party had confirmed anything. The defence is unglamorous. It is a list of documents, requested in writing, before a deposit.
Every item below is checkable by someone other than the seller. That is the only test that matters, and it is why the list is worth having in your hand rather than in your memory. A seller who hesitates on a specific document has told you something useful at no cost to you.
0 of 0 collected
Ticks are stored in this browser only. Nothing is sent to us and nothing is required to use this page.
Want this list in your inbox?
Entirely optional, and the page works without it. We will send the list as you have it now, filtered to what you selected, so you have it to hand when you are talking to a seller or a notary. It also tells us what kind of purchase you are looking at, which means any reply we send can be specific rather than generic.
We use your data only to send this list and answer your questions about it. No newsletter without your separate consent, and no sharing with third parties.
Applies to every purchase
The land certificate: type, number and registered holder
Ownership
Not a photograph of a certificate. The type (SHM, HGB or Hak Pakai), the certificate number, and the name of the registered holder, so that your own notary can match it against the land registry.
Who issues it, how it is checked, what to watch for
If the registered holder is not the party selling to you, that gap needs a documented explanation before anything else proceeds.
What it proves
That the right exists, what kind of right it is, and who currently holds it.
Who issues it
BPN, the National Land Agency, through the regency land office.
How it is checked
By your own notary or PPAT against the registry, not by reading the paper you were handed.
Watch for: a certificate shown only as an image, a holder named as an individual when you are dealing with a company, or a refusal to release the number on the grounds of privacy. The number is what makes the check possible.
Zoning confirmation for that specific parcel
Use
Indonesian land is allocated to categories of use, and the allocation is set out in the regional spatial plan, the RTRW.
Who issues it, how it is checked, what to watch for
Conformity for one particular plot is confirmed through the KKPR. A parcel zoned for agriculture stays zoned for agriculture regardless of what stands on the land next to it, and neighbouring development is not evidence of what is permitted on yours.
What it proves
Whether the use you intend is permitted on that plot.
Who issues it
Confirmed through the national KKPR system; the regency planning office is where to ask.
How it is checked
As a lookup on a specific parcel. A general statement about the area is not an answer.
Watch for: "the whole area is tourism zone" offered in place of a document. A title can be entirely clean while the project is not permitted. How the instruments fit together is set out in zoning in Indonesia: RTRW, RDTR and KKPR.
Documented legal access to a public road
Access
A right of access is not recorded on the land certificate, and its absence is invisible on a site visit.
Who issues it, how it is checked, what to watch for
A track that has been driven for years is not a right of way, and a neighbour's tolerance does not bind whoever inherits or buys that neighbour's land.
What it proves
That you can lawfully reach the property, and will still be able to after the land around it changes hands.
Who issues it
Created by deed or easement; evidenced separately from the certificate.
How it is checked
A separate enquiry, instructed specifically. It is not part of a standard title check.
Watch for: parcels subdivided out of larger family holdings over time, which is common in Lombok and is where access is most often left informal.
The seller's identity and authority to sell
Counterparty
Who is on the other side of the transaction, and whether they are entitled to conclude it.
Who issues it, how it is checked, what to watch for
For an individual that means identity documents matching the registered holder, and consent from a spouse or from co-heirs where the land is jointly held. For a company it means the deed of establishment, the current NIB, and evidence that the person signing may bind it.
What it proves
That the signature you are relying on has legal effect.
Who issues it
Civil registry and company filings; company data is publicly checkable against the NIB.
How it is checked
By your own notary, alongside the registry check on the certificate.
Watch for: inherited land where not every heir has signed. A missing heir can surface years later. The five-year limit on challenging a certificate protects only a holder who acquired in good faith and physically holds the land, so do not rely on it.
Land and building tax receipts (PBB)
Liabilities
Recent PBB receipts, and confirmation that nothing is outstanding.
Who issues it, how it is checked, what to watch for
In practice the notary asks for recent PBB receipts before the deed is signed, so an unpaid history surfaces during the transfer; ask for the receipts before, not after. The assessment also states the officially assessed value (NJOP). Acquisition duty is calculated on the transaction value, with NJOP acting as a floor where the stated price is lower, so the assessment tells you the minimum the duty will be based on rather than the figure itself.
What it proves
That the property carries no tax arrears, and what the assessed value (NJOP) is.
Who issues it
The regency revenue office.
How it is checked
Receipts for recent years, cross-read against the parcel identified on the certificate.
Watch for: receipts that describe a different parcel from the one you are buying.
The deed route, in writing: PPJB or AJB, and which PPAT
Process
Ask which document you will actually be signing and when.
Who issues it, how it is checked, what to watch for
A PPJB is a binding agreement to transact later, used where completion is not yet possible. It does not transfer the right. An AJB is the transfer itself, executed before a PPAT and followed by registration. After a PPJB you hold a claim against the seller, not a registered right in the land, so the wording carries the weight.
What it proves
What you will hold at each stage, and when the right actually moves.
Who issues it
A PPAT whose appointed working area covers the place where the land sits.
How it is checked
Confirm that the PPAT's appointed area covers the location. A deed executed without it creates a registration problem.
Watch for: being told the transfer is "done" at PPJB stage. Also ask to instruct your own notary rather than the one the seller proposes. A fair seller will not mind, and the reaction is free information.
Who the seller or agent is, in writing
Counterparty
Company name, registration number (NIB), and their role in the transaction: owner, developer, appointed agent or introducer.
Who issues it, how it is checked, what to watch for
All of it is checkable against public records, which is the reason to ask for it in a form you can keep.
What it proves
Who you would be pursuing, and in what capacity, if something went wrong.
Who issues it
OSS company records, against the NIB.
How it is checked
Publicly, against the registration number.
Watch for: a party who will describe their role verbally but not in writing.
Because it is off-plan
The building permit (PBG), granted rather than applied for
Permits
The PBG, Persetujuan Bangunan Gedung, replaced the IMB.
Who issues it, how it is checked, what to watch for
Ask for the reference number and the date it was granted. "Applied for", "in process" and "the notary is handling it" are not the same thing as granted, and a build without its permit can be stopped or ordered removed.
Ask to see the permit itself, even for a villa that is already standing. On 10 November 2026 the head of Central Lombok's enforcement unit said investors there can build first and take care of their permits afterwards. He called it a local policy to bring in investment, and said there is no compromise for a building that breaks the spatial plan (Inside Lombok, 10 November 2026). In East Lombok, Radar Lombok reported on 5 November 2026 that about one in ten hotels and guesthouses around Sembalun held a building approval, citing the licensing office, which said its own count was not finished. You cannot tell from a finished building whether its permit was granted, so ask the seller for the PBG number and its date.
What it proves
That what is being built is authorised, in the form it is being built.
Who issues it
The regency building authority. A private owner applies through SIMBG, the building permit system; a business applicant registers it through OSS (PP 28/2025).
How it is checked
By reference number. That is the point of asking for it.
Watch for: an IMB quoted for a current build. It would no longer be issued, so the document being described is either old or misdescribed.
A payment schedule tied to certified milestones, inside the contract
Money
Deposits funding construction is how off-plan works.
Who issues it, how it is checked, what to watch for
Deposits disappearing into an unbuilt project is how it fails. The protection is written milestones: money releases when progress has been certified by someone independent, and a meaningful final portion is held back to handover.
What it proves
That your exposure at any moment is tied to work actually completed.
Who issues it
It is a contract term, not a certificate. It has to be in the document you sign.
How it is checked
Read it against the build programme, and ask who certifies each milestone.
Watch for: a calendar-based schedule that pays out on dates regardless of progress, and a final instalment too small to matter at handover.
What happens if it is late, or never finished
Contract
The completion date, and then the part most contracts leave thin: what you are entitled to if that date passes, and what happens to money already paid if the project stops.
Who issues it, how it is checked, what to watch for
Ask for the clause, not for reassurance.
What it proves
Whether delay has a consequence for the developer or only for you.
Who issues it
A contract term.
How it is checked
Read alongside the payment schedule. The two only work together.
Watch for: a completion date with no remedy attached, which makes it a statement of intention rather than an obligation.
Where your money sits between payment and completion
Money
Which account receives the funds, in whose name, and whether anything holds it separately from the developer's working capital.
Who issues it, how it is checked, what to watch for
Related to this: how the transfer itself will be made, which has its own requirements at the Indonesian end and is covered in transferring money to Indonesia.
What it proves
Whether your deposit is ring-fenced or simply spent.
Who issues it
Bank details plus whatever agreement governs the account.
How it is checked
The account name should match the contracting party. If it does not, ask why before sending anything.
Watch for: payment requested to a personal account, or to a company other than the one named in your contract.
Soil investigation and a structural design certified to SNI 1726:2019
Build
Lombok is seismically active, and the 2018 earthquakes made construction quality a live question for every buyer.
Who issues it, how it is checked, what to watch for
SNI 1726:2019 is the Indonesian standard for earthquake resistance in building design. Ask for the soil report and for confirmation that the structural design was prepared against that standard by a named engineer.
What it proves
That the ground was tested and the structure designed for it, rather than copied from a previous project.
Who issues it
A geotechnical contractor and a structural engineer.
Watch for: "built to international standards" as an answer. It names no standard and no engineer.
The developer's completed projects, and their company filings
Counterparty
What they have finished, where it is, and when it was handed over, so that you can go and look at it or speak to an owner.
Who issues it, how it is checked, what to watch for
Alongside that, the company's own filings against its NIB.
What it proves
Whether the delivery record is real or is a rendering.
Who issues it
OSS records for the company; the projects speak for themselves.
How it is checked
By visiting one, or by contacting a buyer the developer did not select for you.
Watch for: a portfolio consisting entirely of projects still in progress.
Because the building already exists
The PBG or IMB for what is actually standing
Permits
An older building may hold a valid IMB granted before the PBG replaced it.
Who issues it, how it is checked, what to watch for
Either way the question is the same: does the permit describe the building that is there now? Extensions, an added floor or an enclosed terrace are where permits and reality most often part company.
What it proves
That the structure as built is authorised, not just the original footprint.
Who issues it
The regency building authority.
How it is checked
Read the permitted drawings against the building, on site.
Watch for: a permit whose floor area is smaller than what you walked through.
The certificate of functional worthiness (SLF)
Permits
The SLF records that a completed building meets the requirements for occupation.
Who issues it, how it is checked, what to watch for
It is a separate document from the building permit and it is issued after construction rather than before it.
What it proves
That the finished building was assessed as fit to be used.
Who issues it
The regency building authority.
How it is checked
By reference number, with the date it was issued.
Watch for: a building in use with no SLF and no explanation of why not.
Registered encumbrances, mortgages and existing leases
Liabilities
Whether the title carries a registered mortgage (Hak Tanggungan), a blocking note, or a lease already granted to someone else.
Who issues it, how it is checked, what to watch for
Existing occupancy arrangements do not necessarily end because ownership changed.
What it proves
What rights other people already hold over the property you are buying.
Who issues it
Mortgages and blocking notes are recorded at the land office against the certificate. A lease may be recorded there too but often is not, so also ask the seller in writing.
How it is checked
Part of your notary's registry check, if you instruct it explicitly.
Watch for: a tenancy that the seller mentions casually and the contract does not mention at all.
Utilities: the electricity connection and the water source
Practical
The PLN connection in whose name and at what capacity, and where the water actually comes from.
Who issues it, how it is checked, what to watch for
Where there is no mains connection, that means a well or a delivered supply, and the arrangement may be informal or shared with neighbours.
What it proves
That the services the property runs on are secured and transferable.
Who issues it
PLN for electricity; the water arrangement varies and may be documented poorly or not at all.
How it is checked
Recent bills, meter capacity, and a direct question about the water.
Watch for: a shared well with no written arrangement, and capacity too low for the way you intend to use the house.
An independent structural assessment
Build
For an existing building in a seismic zone, an engineer's opinion on how it was built and how it has held up, particularly for anything constructed before 2018.
Who issues it, how it is checked, what to watch for
This is the closest available equivalent to the design documents you would receive on a new build.
What it proves
The physical condition and construction quality of what you are buying.
Who issues it
A structural engineer you appoint and pay.
How it is checked
On site, by someone with no relationship to the seller.
Watch for: fresh render or paint on a building whose age suggests it lived through 2018.
Because it is bare land
The measurement letter (surat ukur) and a physical boundary walk
Boundaries
The measurement letter attached to the certificate, plus boundaries walked and agreed on site with the neighbours present.
Who issues it, how it is checked, what to watch for
Discrepancies between the registered area and what is physically occupied are common where parcels have been split informally over generations.
What it proves
Where the land you are paying for actually is, and how much of it there is.
Who issues it
BPN, as part of the registration of the parcel.
How it is checked
On the ground, against the plan, ideally with a licensed surveyor.
Watch for: a registered area that does not match what you were shown, and boundaries marked only by planting or a low wall someone else built.
The ownership history, including inheritance and consents
Ownership
How the current holder came to hold it. Where land passed by inheritance, the consent of every heir matters, and where it is held within a marriage, spousal consent matters.
Who issues it, how it is checked, what to watch for
Much land in south Lombok has been subdivided out of larger family holdings, so this is not a formality.
What it proves
That nobody else has a claim that has simply not surfaced yet.
Who issues it
Prior deeds, inheritance documents and village records.
How it is checked
By your notary, tracing the chain rather than reading only the current certificate.
Watch for: an heir who is abroad, uncontactable or unnamed.
Whether the land is agricultural, and what conversion involves
Use
Land currently classified as agricultural, including productive rice land, is treated differently from land already allocated to building.
Who issues it, how it is checked, what to watch for
Establish the current classification and what changing it would require before you price the plot, not after.
What it proves
Whether you are buying a building plot or a project to create one.
Who issues it
The land office and the local planning office, together with the zoning position.
How it is checked
Alongside the KKPR enquiry, as one question rather than two.
Watch for: a seller who treats conversion as a formality with a known price and no timeline.
A soil investigation before you design anything
Build
On a sloping or coastal plot the ground conditions drive the foundation design, and the foundation drives a meaningful part of the build cost.
Who issues it, how it is checked, what to watch for
Finding out afterwards is how budgets move by amounts that matter. The seismic design standard is SNI 1726:2019, and it is applied to the results of this test.
What it proves
What it will cost to build safely on this specific plot.
Who issues it
A geotechnical contractor you appoint.
How it is checked
Before purchase where the seller permits it, otherwise as a condition in the contract.
Watch for: steep plots priced as if they were flat ones.
Because it is an operating business
The company, its NIB, and the KBLI codes it actually holds
Licensing
An Indonesian company may only carry out the activities its licensing covers.
Who issues it, how it is checked, what to watch for
Check that the KBLI codes on the NIB match what the business does in practice, and that they are live rather than merely listed in the deed of establishment.
What it proves
That the trading you are buying is licensed trading.
Who issues it
OSS, the online single submission system.
How it is checked
Publicly, against the NIB. Compliance history is visible there too.
Watch for: a code present in the deed but never activated, and activities being carried out under a code that does not cover them.
Operating and accommodation licences
Licensing
Tourism accommodation carries its own registration requirements on top of company licensing, and the position for small guest accommodation differs from that for a hotel.
Who issues it, how it is checked, what to watch for
Establish which regime the property is operating under and whether it is current.
What it proves
That the accommodation may lawfully be let in the way it is being let.
Who issues it
The regency, through the tourism and licensing offices.
How it is checked
By document and reference number, confirmed locally for that regency.
Watch for: a property advertised nightly on booking platforms with only residential permissions behind it.
Trading records that can be reconciled
Money
Not a summary spreadsheet. Filed accounts, tax returns, and platform statements that can be read against bank statements for the same periods.
Who issues it, how it is checked, what to watch for
Where the three do not agree, the difference is the question.
What it proves
What the business actually took, as opposed to what it is described as taking.
Who issues it
The company, its accountant, and the booking platforms.
How it is checked
By an accountant you appoint, reconciling the sources against each other.
Watch for: occupancy and rate figures supplied without the statements that would evidence them.
Staff, contracts and social security position
Liabilities
Who is employed, on what terms, for how long, and whether social security registration and contributions are up to date.
Who issues it, how it is checked, what to watch for
Employment liabilities travel with the business and Indonesian severance entitlements accumulate with length of service.
What it proves
What obligations you take on alongside the trade.
Who issues it
Employment contracts and BPJS records.
How it is checked
By an Indonesian employment adviser, as part of the acquisition rather than after it.
Watch for: long-serving staff with no written contracts, which does not reduce the liability.
Existing management, franchise and supplier agreements
Contract
What the business is already tied into, for how long, and whether those agreements survive a change of control.
Who issues it, how it is checked, what to watch for
A management contract that cannot be exited is part of what you are buying whether or not it appears in the price.
What it proves
How much freedom you would actually have on day one.
Who issues it
The counterparties to each agreement.
How it is checked
By reading the termination and change-of-control clauses first.
Watch for: an agreement with an automatic renewal that has already renewed.
Because you would hold it on a lease
The lease deed: start date, term, and years actually remaining
Term
A lease is quoted by its headline term and lived by its remaining term.
Who issues it, how it is checked, what to watch for
Establish the date it started and subtract. A twenty-five year lease with eleven years elapsed is a fourteen-year asset, and that is the number that should be driving the price.
What it proves
How long you would actually hold the right you are paying for.
Who issues it
The lease deed itself, executed before a notary.
How it is checked
Arithmetic on the commencement date in the deed, not on the description in the listing.
Watch for: the headline term used in marketing while the commencement date sits several years in the past.
The extension mechanism, and what it will cost
Term
Whether extension is a right you can exercise or a negotiation you may lose, who decides, on what basis the price is set, and by when it must be triggered.
Who issues it, how it is checked, what to watch for
Because the term has a fixed end, the extension clause carries much of the value.
What it proves
Whether the asset has a future beyond the current term, and on whose terms.
Who issues it
A clause in the lease deed.
How it is checked
By reading the clause. "Extendable" on its own describes nothing.
Watch for: extension "at market rate to be agreed", which is an intention rather than a mechanism.
What happens to the building at expiry, and your rights during the term
Term
What happens to the building at the end of the lease is decided by the deed. Where the deed is silent, do not assume you keep anything: have the clause written, including whether any compensation is payable for improvements.
Who issues it, how it is checked, what to watch for
Confirm that position, and confirm what you may do meanwhile: sublet, transfer the lease to a buyer, and pass it to your heirs.
What it proves
What you own at the end, and whether you can exit before it.
Who issues it
Clauses in the lease deed.
How it is checked
Read together with the extension clause. Transferability is what makes resale possible.
Watch for: a lease that cannot be assigned without the landowner's consent and sets no standard for withholding it.
The lease as a notarial deed, and what it says about successors
Ownership
Ask to see the draft deed, and how it binds the landowner’s heirs and any future buyer of the land.
Who issues it, how it is checked, what to watch for
A lease (Hak Sewa) is a contractual right under the Basic Agrarian Law, Articles 44 to 45. It is not registered as a land right of its own. A lease of registered land can be recorded against the owner’s certificate at the land office (PP 18/2021, Article 90), but that is optional and often not done, so ask whether it has been recorded and do not treat a recording as a substitute for a well-drafted deed. What protects you instead is the drafting: a notarial deed rather than a private agreement, and explicit terms binding the landowner’s heirs and any subsequent buyer of the land.
What it proves
That the lease is in a form with evidentiary weight, and that it survives the landowner dying or selling.
Who issues it
The notary drawing the deed. Have your own notary read it, not the seller’s.
How it is checked
By reading the draft before signing, specifically the successor, assignment and extension clauses.
Watch for: anyone telling you the lease “will be registered at the land office”, a private agreement offered instead of a notarial deed, or silence on what happens if the landowner dies or sells.
Because you would hold Hak Pakai
Your immigration documents, and the position at renewal
Eligibility
Hak Pakai is a right of use registered in your name. The law requires you to hold Indonesian immigration documents, which the regulation defines as a visa, passport or residence permit. Some land offices ask for more than the law requires in practice, so confirm what the Lombok office will accept before you rely on the minimum.
Who issues it, how it is checked, what to watch for
Extension and renewal are not automatic: among other conditions, you must still qualify as a holder when you apply. Establish with a lawyer what your position would be at extension time rather than discovering it during a renewal.
What it proves
That you are eligible to hold this title, and remain so.
Who issues it
Immigration, for your documents; BPN for the title.
How it is checked
With an Indonesian lawyer, on your specific documents and permit type.
Watch for: being told eligibility is a formality. It is a condition of holding the title, and of extending it.
The term, the renewal path, and any minimum-value condition
Eligibility
Hak Pakai is granted for a defined period with a defined route to extension and renewal.
Who issues it, how it is checked, what to watch for
Foreign acquisition of residential property is also subject to conditions that vary by province and by property type. Both need confirming for your province and your property, from a current source, because this is an area where published guidance goes stale quickly.
What it proves
That the purchase qualifies, and for how long it runs.
Who issues it
National regulation, applied through the regional land office.
How it is checked
Against the current regulation by an Indonesian lawyer. We do not publish the thresholds here because they are set per province and revised, and a stale number is worse than none.
Watch for: a threshold quoted to you without a source and a date. Ask which regulation it comes from, then have it confirmed for your province.
Because you would hold it through a PT PMA
The company: deed, NIB, KBLI and capital position
Structure
A PT PMA is an Indonesian company you own, holding a build-and-use title.
Who issues it, how it is checked, what to watch for
Whether you are buying an existing one or forming a new one, the same items apply: the deed of establishment, the NIB, the KBLI codes covering what you intend to do, and the paid-up capital position. The minimum paid-up capital was reduced from IDR 10 billion to IDR 2.5 billion with effect from 2 October 2025.
What it proves
That the vehicle is properly constituted and licensed for the activity.
Who issues it
The notary for the deed; OSS for the NIB and licensing.
How it is checked
Against the NIB, publicly. If you are buying an existing company, its compliance record travels with it.
Watch for: buying a dormant company to save time. You inherit its filing history, its liabilities and its compliance record.
The continuing obligations, costed
Structure
A company is not a one-off cost. It carries ongoing reporting, tax registration and annual filings, and those continue whether or not the property earns anything.
Who issues it, how it is checked, what to watch for
Get the annual figure in writing from whoever will do the work before you choose this route.
What it proves
What the structure costs to keep alive each year.
Who issues it
Your Indonesian corporate services provider or accountant.
How it is checked
A written annual quotation, not a verbal estimate.
Watch for: set-up cost quoted enthusiastically and running cost not quoted at all.
Because the structure is not settled yet
Written advice on which structure fits, before you commit
Structure
Foreign individuals cannot hold Indonesian freehold, Hak Milik, which is reserved to Indonesian citizens.
Who issues it, how it is checked, what to watch for
Three routes exist instead, they are genuinely different instruments, and changing between them later means a fresh transaction with fresh costs. The decision turns on whether you will use the property, let it commercially, or both.
What it proves
That the structure was chosen for your situation rather than for the seller's convenience.
Who issues it
An Indonesian lawyer you appoint and pay.
How it is checked
Start with the twelve questions, then take advice on the two or three that apply to you.
Watch for: any arrangement in which an Indonesian citizen holds the title on your behalf. Nominee arrangements are void, and the reasons are set out in the nominee guide.
One question that costs nothing. Ask to instruct your own independent notary or PPAT rather than the one the seller recommends. The seller's notary is usually licensed and competent, but is chosen by the seller, paid by the seller and works with them repeatedly. A fair seller will not object, and their reaction is free information.
How to use the list
Send it as a written request rather than raising items in conversation. A written request produces a written answer, and a written answer is something you can hand to your notary, compare against the certificate and return to months later. It also creates a record of what you were told before you paid, which is exactly the record that is missing in most purchases that go wrong.
Expect some items to come back partially. That is normal, particularly on off-plan projects, and an honest "not yet, here is when" is a different answer from silence. What matters is that you know which column each item is in before money moves rather than after.
Common questions
What documents do I need to buy property in Lombok?
Seven apply to every purchase, whatever the deal type. The land certificate, stating type, number and registered holder, checked against the BPN registry by your own notary. Zoning confirmation for that specific parcel through the spatial plan RTRW and use conformity KKPR, obtained from the local planning office. Documented legal access to a public road, which the certificate does not address. Proof of the seller's identity and authority to sell, including spousal or heirs' consent where the land is held personally. Land and building tax PBB receipts, because an unpaid history surfaces during the transfer and in practice ends up as the buyer's problem. The deed route in writing, meaning whether you are signing a PPJB or an AJB and a PPAT whose appointed working area covers the land. And written confirmation of who the seller or agent is, with the registration number their company trades under, so you can check them against public records. Off-plan purchases, completed buildings, bare land and operating businesses each add a further set on top.
What is the difference between PPJB and AJB in Indonesia?
A PPJB is a binding agreement to sell and buy at a future point, used where the transfer cannot yet be completed, most commonly because the building is not finished or a condition is outstanding. It does not transfer the right. An AJB is the deed of transfer itself, executed before a PPAT and followed by registration of the new holder at the land office. The practical consequence is that after signing a PPJB you hold a contractual claim against the seller, not a registered right in the land, so what protects you is the wording of the PPJB and the conditions attached to each payment.
Is IMB still the building permit in Indonesia?
No. The IMB was replaced by the PBG, Persetujuan Bangunan Gedung. A building that already held a valid IMB granted before the change generally remains valid, but anything newly permitted is a PBG, and a seller quoting an IMB for a current or recent build is describing a document that would no longer be issued. On completion the separate certificate of functional worthiness, the SLF, records that the building as constructed may be occupied. A listing that references an IMB for a project under construction is worth a direct question rather than an assumption.
Can a notary confirm that my intended use is permitted on the land?
Not as a matter of course. A PPAT verifies ownership and the validity of the transfer: the certificate, the registry entry, the seller's identity and authority, and registered encumbrances. Whether your intended use is permitted on that parcel is determined by the regional spatial plan RTRW and confirmed for the specific plot through the KKPR, and that information comes from the local planning office. A title can be entirely clean while the project you intend to build on it is not permitted.
Sources
Law 5/1960, the Basic Agrarian Law (UUPA): Hak Milik reserved to Indonesian citizens (Article 21), nominee arrangements void (Article 26(2)), and the lease (hak sewa) as a contractual right (Articles 44 to 45). Checked 1 September 2026.
PP 18/2021, Article 69 and its elucidation, on the immigration documents a foreign Hak Pakai holder must hold. Checked 1 September 2026.
PP 16/2021 and the SIMBG system: the PBG replacing the IMB, and the SLF as the separate certificate of functional worthiness on completion. Checked 31 August 2026.
PP 24/2016, on the PPAT's appointed working area. Checked 1 September 2026.
Building before the permit: the head of the enforcement unit (Satpol PP) of Central Lombok, as reported by Inside Lombok, 10 November 2026; the Sembalun figure, credited to East Lombok's licensing office and reported by Radar Lombok, 5 November 2026 (the office said its count was not finished). Both read 27 November 2026. These are press reports of spoken statements, not regulations.
PP 18/2021, Article 90, on recording a lease against the owner's certificate; PP 24/1997, Article 32(2), on the five-year limit for challenging a certificate; PP 28/2025, Articles 106 to 116, on registering a PBG through OSS. Checked 15 November 2026.
UU 1/2022 and Perda Lombok Tengah 1/2024, on the base for acquisition duty: the transaction value, with the NJOP as the floor. Checked 1 September 2026.
SNI 1726:2019, the Indonesian standard for earthquake resistance in building design. Checked 31 August 2026.
Permeninves/BKPM Regulation 5/2025: PT PMA minimum paid-up capital reduced from IDR 10 billion to IDR 2.5 billion with effect from 2 October 2025. Checked 31 August 2026.
Indonesian practitioner guidance on the scope of PPAT engagements, including that verification of land use is not automatically within scope. Checked 31 August 2026.
Lombok Lawyers and Cekindo, due-diligence checklists for land purchases in Lombok, on BPN matching, zoning, access and survey. Checked 31 August 2026.
General information, not legal, tax or investment advice. Requirements differ by regency and change over time, and the list above is a starting point for instructing your own advisers rather than a substitute for them. Minimum-value conditions for foreign acquisition are deliberately not quoted here because they are set per province and revised, and a stale number is worse than none; ask which regulation a quoted threshold comes from.
Research and drafting are AI-assisted. Every legal, tax and numerical claim is then checked against a named source, listed below, and dated. Nothing is published without a person signing it off.
Tell us what you are looking for, and we write to you when a seller matches. If you would like our numbers on a property you have been shown, tick the Forecast box in the same form.