LOMBOKHORIZON Start here
Guides · Verification

Instructing your own notary, in writing

Beyond the statutory core, a PPAT checks what they were instructed to check. Most buyers never define that, then assume it covered everything. This writes the instruction.

Checked 1 September 2026. Claims re-checked and corrected on 15 November 2026. Sources are listed at the end. Jump to them.

The single most consequential document in an Indonesian purchase is not the certificate or the deed. It is the instruction you give your notary, because beyond the checks the law requires of every PPAT, the scope of that instruction decides what actually gets checked.

A PPAT verifies ownership and the validity of the transfer: the certificate, the registry entry, the seller's identity and authority, registered encumbrances, the deed itself. Whether your intended use is permitted on that land, whether legal access exists, whether the building standing there is the building that was permitted, are separate enquiries that fall outside that scope unless someone instructs them. Buyers discover this afterwards, having assumed that "the notary checked it" meant something broader than it did.

The other half of the point. Ask to instruct your own notary rather than the one the seller proposes. The seller's notary is usually licensed and competent, but is chosen by the seller and works with them repeatedly, so the continuing professional relationship sits on that side. A fair seller will not object, and their reaction to the request is free information either way.

Generate the letter

The letter adapts to what you are buying and how you would hold it. Nothing you enter leaves your browser.

Your purchase

The province matters: PPAT authority covers one province.
Your letter


    

The clause that matters most

The letter ends by asking the notary to confirm in writing which of the listed enquiries fall outside the scope of their engagement. That single request is worth more than the rest of the letter, for two reasons.

It converts an assumption into a record. If zoning conformity was not within scope, you now know that in writing, before completion, and can instruct someone else on it rather than discovering the gap later. And if a dispute ever arises about what was checked, the scope of the engagement is the document that decides it.

Expect some items to come back as outside scope. That is normal and not a criticism of the notary: several of these enquiries genuinely belong to the planning office, a surveyor or a structural engineer rather than to a land deed official. What matters is that you know which column each one is in before money moves. The full document list behind these enquiries is in the document checklist, and what a PPAT does and does not cover is set out in what a notary does not check.

Common questions

Can I use my own notary when buying property in Indonesia?

Yes. A buyer is entitled to instruct their own Notaris or PPAT, and the cost difference is small relative to a six-figure purchase. The notary a seller proposes is usually licensed and competent but is chosen by the seller and works with them repeatedly, so the continuing professional relationship lies on that side. Where the seller's notary is used anyway, it is worth setting out in writing what has been instructed and what has not.

What should I instruct my Indonesian notary to check?

At minimum: the certificate type, number and registered holder verified against the BPN registry rather than from a copy; whether the registered holder is the party selling to you; the seller's capacity including spousal or heirs' consent; registered encumbrances such as a mortgage, and any lease or occupancy arrangement affecting the land; PBB tax receipts, since an unpaid position has to be resolved before the transfer can complete; and which deed you will sign and when. Then add the items specific to your purchase, and always ask which enquiries fall outside their scope.

Does an Indonesian notary check zoning and building permits?

Not as a matter of course. A PPAT verifies ownership and the validity of the transfer. Zoning conformity, confirmed for a specific parcel through the KKPR, comes from the local planning office. The building approval, the PBG, is a separate document with its own reference number. Legal access to a public road is a separate enquiry again and is not evidenced by the certificate. Each has to be instructed specifically or carried out by someone else, and a title can be entirely clean while the intended project is not permitted.

Sources

  • PP 37/1998 jo. PP 24/2016 on the office of PPAT, including the provincial working area. Checked 1 September 2026.
  • PMNA/KaBPN 3/1997 Art 97, mandatory certificate check against the land office before any deed. Checked 1 September 2026.
  • PP 35/2023 Art 60, proof of BPHTB payment required before a deed is signed. Checked 1 September 2026.
  • PP 21/2021 and Permen ATR/BPN 13/2021 on spatial-plan conformity (KKPR). Checked 1 September 2026.
  • PP 16/2021 on building approval (PBG) and sanctions. Checked 1 September 2026.

General information, not legal advice. The generated letter is a starting point for instructing a professional, and its contents should be adjusted to your transaction. The scope of individual notaries and local requirements differ by regency. Nothing you enter is transmitted to us or stored.

Read next

How this guide is made

Research and drafting are AI-assisted. Every legal, tax and numerical claim is then checked against a named source, listed below, and dated. Nothing is published without a person signing it off.

General information, not legal, tax or investment advice. How we write the guides.

Next step

Not appointed a notary yet?

Our guide to what an Indonesian notary checks sets out what to ask before appointing one. To hear when a seller matches what you want, create a buyer profile.

Create a buyer profile